Published May 18, 1983 | Version v1
Report Restricted

Technical-evaluation report on the monitoring of electric power to the reactor-protection system for the Dresden Nuclear Power Station, Units 2 and 3, Docket Nos. 50-237, 50-249

Description

This report documents the technical evaluation of the monitoring of electric power to the reactor protection system (RPS) at the Dresden Nuclear Power Station, Units 2 and 3. The evaluation is to determine if the proposed conditions which could be supplied from the power supplies and will meet certain requirements set forth by the Nuclear Regulatory Commission. The proposed design modifications will protect the RPS from sustained abnormal voltage and frequency conditions from the supplying sources

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS, PC A02/MF A01 as DE83011809.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
9 p.
Report number
UCID--19705