Published May 1986
| Version v1
Journal article
Use of an automatic welding unit for assembling the primary coolant circuit of the Paks nuclear power station
Description
Setup and function of the automatic welding unit ASTRO-ARC E-300-P4/AM 11 are described including quality control and TIG welding of circumferential seams at pipes in a nuclear power station
Additional details
Additional titles
- Original title (German)
- Einsatz eines Schweissautomaten fuer Montageaufgaben im Primaerkreislauf des Kernkraftwerkes Paks
Publishing Information
- Journal Title
- ZIS (Zentralinst. Schweisstech.)-Mitt.
- Journal Volume
- 28
- Journal Issue
- 5
- Series
- ZIS (Zentralinst. Schweisstech.)-Mitt.
- Journal Page Range
- 533-538
- ISSN
- 0044-1465
- CODEN
- ZISMA
INIS
- Country of Publication
- Germany
- Country of Input or Organization
- German Democratic Republic
- INIS RN
- 17062827
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Descriptors DEI
- AUTOMATION; GAS TUNGSTEN-ARC WELDING; PRIMARY COOLANT CIRCUITS; QUALITY CONTROL; WELDED JOINTS
- Descriptors DEC
- ARC WELDING; CONTROL; COOLING SYSTEMS; FABRICATION; GAS METAL-ARC WELDING; JOINING; JOINTS; REACTOR COMPONENTS; REACTOR COOLING SYSTEMS; WELDING