Published 1997
| Version v1
Report
Open
Meeting the energy demand of high load density areas
Description
Due to the high cost of land and in some places, unavailability of land, the existing standard substation of Meralco (Manila Electric Company) can no longer be used in many places of Metro Manila. To cope with this problem, the GIS (Gas Insulated System) substation is now being resorted to. There are various schemes of developing a GIS substation, each fitted to certain particular conditions. Cost implications and design considerations were also briefly discussed. (author)
Availability note (English)
Available from INIS in electronic form and/or on microfiche ; Also available from PNRI Library, Quezon City, Philippines.Files
29036444.pdf
Files
(847.8 kB)
| Name | Size | Download all |
|---|---|---|
|
md5:5fd0005ac99344dedd89a4937227fb85
|
847.8 kB | Preview Download |
Additional details
Publishing Information
- Imprint Pagination
- [16 p.].
- Report number
- PNRI-F(ES)--98009
INIS
- Country of Publication
- Philippines
- Country of Input or Organization
- Philippines
- INIS RN
- 29036444
- Subject category
- S29: ENERGY PLANNING, POLICY AND ECONOMY;
- Descriptors DEI
- ECONOMIC IMPACT; ELECTRIC POWER; ENERGY DEMAND; ENERGY SOURCES; POWER DEMAND; POWER DISTRIBUTION; POWER GENERATION; SOCIO-ECONOMIC FACTORS
- Descriptors DEC
- DEMAND; DISTRIBUTION; INSTITUTIONAL FACTORS; POWER; SPATIAL DISTRIBUTION
Optional Information
- Notes
- Paper presented during the S and T celebration, Symposium on Energy, 23 Oct 1997, Dusit Hotel Nikko, Makati City (PH); 9 figs.