Published 1997 | Version v1
Report Open

Meeting the energy demand of high load density areas

Description

Due to the high cost of land and in some places, unavailability of land, the existing standard substation of Meralco (Manila Electric Company) can no longer be used in many places of Metro Manila. To cope with this problem, the GIS (Gas Insulated System) substation is now being resorted to. There are various schemes of developing a GIS substation, each fitted to certain particular conditions. Cost implications and design considerations were also briefly discussed. (author)

Availability note (English)

Available from INIS in electronic form and/or on microfiche ; Also available from PNRI Library, Quezon City, Philippines.

Files

29036444.pdf

Files (847.8 kB)

Name Size Download all
md5:5fd0005ac99344dedd89a4937227fb85
847.8 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
[16 p.].
Report number
PNRI-F(ES)--98009

INIS

Country of Publication
Philippines
Country of Input or Organization
Philippines
INIS RN
29036444
Subject category
S29: ENERGY PLANNING, POLICY AND ECONOMY;
Descriptors DEI
ECONOMIC IMPACT; ELECTRIC POWER; ENERGY DEMAND; ENERGY SOURCES; POWER DEMAND; POWER DISTRIBUTION; POWER GENERATION; SOCIO-ECONOMIC FACTORS
Descriptors DEC
DEMAND; DISTRIBUTION; INSTITUTIONAL FACTORS; POWER; SPATIAL DISTRIBUTION

Optional Information

Notes
Paper presented during the S and T celebration, Symposium on Energy, 23 Oct 1997, Dusit Hotel Nikko, Makati City (PH); 9 figs.