Published 2014 | Version v1
Journal article

Condition analysis and operating lifetime extension concepts for wind turbines

  • 1. GMA-Engineering GmbH, Hamburg (Germany). Business Unit Wind Energy

Description

In Germany the basis for the expansion of wind energy was already laid at the beginning of the 1990s. Hence, the first wind turbines already started to reach the end of their permitted lifetime. At that time as today the different wind turbine types were engineered for an operational lifetime of 20 years. As reliable wind turbines types were already available in the 1990s, it is technically and commercially reasonable to consider the extension of their operational lifetime. Of particular interest is the lifetime extension of wind turbine types installed in the beginning of the 2000s. During that period many wind turbine types were launched which absolutely correspond to state-of-the-art technology.

Additional details

Publishing Information

Journal Title
VGB PowerTech
Journal Volume
94
Journal Issue
10
Journal Page Range
p. 67-70
ISSN
1435-3199

INIS

Country of Publication
Germany
Country of Input or Organization
Germany
INIS RN
45105467
Subject category
S17: WIND ENERGY;
Descriptors DEI
FEDERAL REPUBLIC OF GERMANY; RETROFITTING; SERVICE LIFE; TIME DEPENDENCE; WIND POWER; WIND TURBINES
Descriptors DEC
DEVELOPED COUNTRIES; ENERGY SOURCES; EQUIPMENT; EUROPE; LIFETIME; MACHINERY; POWER; RENEWABLE ENERGY SOURCES; TURBINES; TURBOMACHINERY; WESTERN EUROPE