Published October 1, 2011 | Version v1
Report

Initial Configuration of Acceleration for the IDS-NF Neutrino Factory

Description

The IDS-NF neutrino factory acceleration system must accelerate the muon beam coming out of cooling to a total energy of 25 GeV. The parameters of the beam being accelerated are given in Table 1. While a certain fraction of the beam will be lost early in acceleration, losses of the beam that falls within the acceptance (see Table 1) should be dominated by decay losses (as opposed to dynamic losses or losses on apertures). Decay losses will be kept small, and the cost of the machine will be reduced to the extent possible, consistent with the above requirements. There is a tradeoff between machine cost and the amount of decay losses, and a reasonable compromise will be made between them. Both muon signs will be accelerated simultaneously.

Availability note (English)

Available from https://www.bnl.gov/isd/documents/76771.pdf; PURL: https://www.osti.gov/servlets/purl/1034062/

Additional details

Publishing Information

Imprint Pagination
10 p.
Report number
BNL--96363-2011-IR

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
43024001
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Non-conventional Literature
Descriptors DEI
ACCELERATION; APERTURES; CONFIGURATION; DECAY; MUON BEAMS; MUONS; NEUTRINOS
Descriptors DEC
BEAMS; ELEMENTARY PARTICLES; FERMIONS; LEPTON BEAMS; LEPTONS; MASSLESS PARTICLES; OPENINGS; PARTICLE BEAMS

Optional Information

Contract/Grant/Project number
KA1502030; AC02-98CH10886
Notes
doi 10.2172/1034062
Funding organization
DOE - Office Of Science (United States)