Seismic qualification of the primary loop of the non-seismically designed Belgian NPP
Description
This paper describes the non linear time history analysis performed to seismically qualify the primary loop of the three first Belgian PWR plants. These plants (Chooz A 300 MWe - commissioned in 1966, and Doel 1/2 2 x 390 MWe - commissioned in 1974 and 1975) were not seismically designed, no seismic event being specified at that time. But, after respectively 20 years and 10 years of operation, the safety authorities required to seismically qualify the primary loop of these plants, for a SSE event. Both primary loops and, particularly, the Chooz A primary loop, have a supporting system that differs from the other seismically qualified Belgian NPP. A seismic qualification by analogy was thus not possible, but they are equipped with restraints designed for LOCA/SLB that will certainly be active in case of an SSE
Additional details
Publishing Information
- Publisher
- American Association for Structural Mechanics in Reactor Technology.
- Imprint Place
- Los Angeles, CA (USA)
- ISBN
- 0-9623306-0-4
- Imprint Title
- Transactions of the 10th international conference on structural mechanics in reactor technology
- Imprint Pagination
- 967 p.
- Series
- Seismic response analysis and design.
- Journal Page Range
- p. 427-432.
Conference
- Title
- 10. international conference on Structural Mechanics in Reactor Technology (SMIRT).
- Dates
- 14-18 Aug 1989.
- Place
- Anaheim, CA (USA).
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 21087904
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- HAZARDS; PWR TYPE REACTORS; REACTOR SAFETY; SEISMIC EFFECTS; SPECIFICATIONS
- Descriptors DEC
- ENRICHED URANIUM REACTORS; POWER REACTORS; REACTORS; SAFETY; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS
Optional Information
- Secondary number(s)
- CONF-890855--.