Modifications to installed Sphincter design gloveports
Creators
Description
This paper presents the results of a study of alternative methods for replacing Sphincter designed gloveports in gloveboxes. In addition, the paper discusses modifications that are required on metal glovebox wall panels to allow replacement of the Sphincter gloveports. A review of Westinghouse Savannah River Co. (WSRC) maintenance records showed that gloveports manufactured by Central Research, Incorporated, provide the lowest risk for failure. This assessment is based on the records of glove-to-port seal life and air in-leakage. These records also indicate the glove changes are made in shorter times with fewer workers than required by alternate gloveport designs studied. These attributes culminate in a significant decrease in radiation exposure and assimilation risk of maintenance personnel replacing gloves. Further, the Central Research design reduces the number of expandable hardware parts required to achieve a glove replacement. This reduction in expendable materials can result in a significant reduction in contaminated waste volume generated during a glove replacement
Additional details
Publishing Information
- Journal Title
- Enclosure
- Journal Volume
- 6
- Journal Issue
- 1
- Journal Page Range
- p. 4-6.
- CODEN
- ECLOEP
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 25003082
- Subject category
- S42: ENGINEERING; S63: RADIATION, THERMAL, AND OTHER ENVIRONMENTAL POLLUTANT EFFECTS ON LIVING ORGANISMS AND BIOLOGICAL MATERIALS;
- Descriptors DEI
- COMPARATIVE EVALUATIONS; DESIGN; GLOVEBOXES; IONIZING RADIATIONS; OCCUPATIONAL EXPOSURE; RADIOACTIVE WASTE DISPOSAL; RELIABILITY
- Descriptors DEC
- EQUIPMENT; EVALUATION; LABORATORY EQUIPMENT; MANAGEMENT; RADIATIONS; WASTE DISPOSAL; WASTE MANAGEMENT