Automation of technical specification monitoring for nuclear power plants
Creators
- 1. Pickard, Lowe and Garrick, Inc., Newport Beach, CA (USA)
Description
The complexity of today's nuclear power plants combined with an equally detailed regulatory process makes it necessary for the plant staff to have access to an automated system capable of monitoring the status of limiting conditions for operation (LCO). Pickard, Lowe and Garrick, Inc. (PLG), has developed the first of such a system, called Limiting Conditions for Operation Monitor (LIMCOM). LIMCOM provides members of the operating staff with an up-to-date comparison of currently operable equipment and plant operating conditions with what is required in the technical specifications. LIMCOM also provides an effective method of screening tagout requests by evaluating their impact on the LCOs. Finally, LIMCOM provides an accurate method of tracking and scheduling routine surveillance. (author)
Additional details
Publishing Information
- Publisher
- Atomic Energy Soc. of Japan.
- Imprint Place
- Tokyo (Japan)
- Imprint Title
- Proceedings of second international topical meeting on nuclear power plant thermal hydraulics and operations
- Imprint Pagination
- 1191 p.
- Journal Page Range
- p. 8/43-8/48.
Conference
- Title
- 2. international topical meeting on nuclear power plant thermal hydraulics and operations.
- Dates
- 15-17 Apr 1986.
- Place
- Tokyo (Japan).
INIS
- Country of Publication
- Japan
- Country of Input or Organization
- Japan
- INIS RN
- 18061613
- Subject category
- S22: GENERAL STUDIES OF NUCLEAR REACTORS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- AUTOMATION; MONITORING; NUCLEAR POWER PLANTS; REACTOR CONTROL SYSTEMS; REACTOR MONITORING SYSTEMS; REACTOR OPERATION; REACTOR OPERATORS; REACTOR SAFETY; REGULATIONS
- Descriptors DEC
- CONTROL SYSTEMS; LAW; NUCLEAR FACILITIES; OPERATION; PERSONNEL; POWER PLANTS; SAFETY; THERMAL POWER PLANTS