Published December 1, 1998 | Version v1
Report

Viability Assessment Volume 1

Description

Since May 1996, under its draft Civilian Radioactive Waste Management Program Plan (DOE 1996), DOE has been carrying out a 5-year program of work to support the decision in 2001 by the Secretary of Energy on whether or not to recommend the site to the President. Part of this program was to address major unresolved technical issues and to complete an assessment of the viability of the Yucca Mountain site by 1998. Affirming the DOE plans, Congress directed DOE in the 1997 Energy and Water Development Appropriations Act to provide a viability assessment of the Yucca Mountain site to Congress and the President. This Viability Assessment (VA) document is the DOE report to Congress and the President. They are expected to use the VA to make an informed decision about program direction and funding. Drawing on 15 years of scientific investigation and design work at Yucca Mountain, the VA summarizes a large technical basis of field investigations, laboratory tests, models, analyses, and engineering, described in cited references. The VA identifies the major uncertainties relevant to the technical defensibility of DOE analyses and designs, the DOE approach to managing these uncertainties, and the status of work toward the site recommendation and LA. The VA also identifies DOE plans for the remaining work, and the estimated costs of completing an LA and constructing and operating a repository. The attention to uncertainties is important because DOE must evaluate how the repository will perform during the next 10,000 years or longer. Uncertainties exist because of variability in the natural (geologic and hydrologic) systems at Yucca Mountain and because of imperfect scientific understanding of the natural processes that might affect the repository system. This is Volume 1 and it covers, Introduction and Site Characteristics, includes a high-level summary of the results of the VA and some additional background information. (The overview is bound separately.) Section 1 of Volume 1 provides introductory information about the types of waste that are destined for geologic disposal, the challenges posed by geologic disposal, a history of efforts to site a geologic repository in the US, a brief description of how DOE manages the repository program, a description of the key technical components of the repository program, and a summary of the DOE approach to identifying and prioritizing the remaining work required to complete an LA. Section 2 of Volume 1 summarizes the DOE understanding of the natural geologic and hydrologic systems of the Yucca Mountain site.

Additional details

Publishing Information

Imprint Pagination
[vp.]
Report number
DOE/RW--0508/V1

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
32013472
Subject category
S12: MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; S58: GEOSCIENCES;
Resource subtype / Literary indicator
Non-conventional Literature
Descriptors DEI
DECISION MAKING; DESIGN; PROBABILISTIC ESTIMATION; RADIOACTIVE WASTE DISPOSAL; RISK ASSESSMENT; SAFETY ANALYSIS; SITE APPROVALS; SITE SELECTION; UNDERGROUND DISPOSAL; YUCCA MOUNTAIN
Descriptors DEC
MANAGEMENT; MOUNTAINS; RADIOACTIVE WASTE MANAGEMENT; WASTE DISPOSAL; WASTE MANAGEMENT

Optional Information

Contract/Grant/Project number
AC01-91RW00134
Funding organization
US Department of Energy (United States)