Published 2020 | Version v1
Miscellaneous

The design of the new beam dump for J-PARC MR upgrade

  • 1. High Energy Accelerator Research Organization (KEK), Tsukuba, Ibaraki (Japan)

Description

In J-PARC Main Ring (MR), the number of shots during beam tuning with a high intensity beam is limited due to shortage of beam dump heat capacity. With the J-PARC MR upgrade for higher intensity, a new beam dump is planned to ease this limitation. The heat capacity of new beam dump is 30 kW. The new beam dump is designed to add the dump core and cooling mechanism into the existing beam dump. It will be planned air-cooled and dump core is made of copper. In this study, Computer Aided Engineering (CAE) analysis was conducted for two models of new beam dump core. As the results of calculation, it was evaluated that the model having cooling fins and legs was suited for dump core. The required cooling air flow late was calculated to be more than 0.52 m3/s. (author)

Availability note (English)

Available from https://www.pasj.jp/web_publish/pasj2020/proceedings/PDF/WEPP/WEPP02.pdf
Part of:
Proceedings of the 17th annual meeting of Particle Accelerator Society of Japan

Additional details

Additional titles

Original title (Japanese)
J-PARC大強度化に伴う新ビームダンプの設計

Publishing Information

Imprint Title
Proceedings of the 17th annual meeting of Particle Accelerator Society of Japan
Imprint Pagination
[971 p.]
Journal Page Range
p. 205-208

Conference

Title
17. annual meeting of Particle Accelerator Society of Japan
Acronym
PASJ2020
Dates
2-4 Sep 2020
Place
Japan (Japan)

Optional Information

Notes
3 refs., 8 figs., 1 tab. Imprint:This symposium was hold online;#7B2C#17#56DE# #65E5##672C##52A0##901F##5668##5B66##4F1A##5E74##4F1A#