Published 1975 | Version v1
Report Open

Control after manufacturing of the 235U enrichment of PWR fuel pellets by delayed gamma radiation counting techniques

Creators

  • 1. CEA Centre d'Etudes Nucleaires de Saclay, 91 - Gif-sur-Yvette (France). Services d'Electronique

Description

A device was developed for measuring the 235U enrichement of PWR fuel elements using the counting technique of delayed gamma radiation

Abstract (French)

On decrit un dispositif mis au point pour la mesure de l'enrichissement en 235U de pastilles de combustibles des barreaux PWR par comptage des gammas differes

Files

8346005.pdf

Files (241.3 kB)

Name Size Download all
md5:03146944e1d36e5f62e1080f2993814c
241.3 kB Preview Download

System files (8.6 kB)

Name Size Download all

Additional details

Additional titles

Original title (French)
Controle apres fabrication, de l'enrichissement en U

Publishing Information

Imprint Title
Meeting on uranium analysis. Saclay, 17-18 December 1975
Journal Page Range
p. 165-172.
Report number
CEA-CR--11

Conference

Title
Meeting on uranium analysis.
Dates
17 - 18 Dec 1975.
Place
Saclay, France.

Optional Information

Notes
Imprint:Reunion technique sur les methodes d'analyse de l'uranium. Saclay, 17-18 decembre 1975.