Published November 1996
| Version v1
Report
Conclusions from integrity analyses of the cold injection piping to the pressurizer and of the HP emergency core cooling system piping of loops no. 2, 3, and 5 at unit 1 of the Mochovce NPP
Description
The objectives and starting assumptions of the analyses are specified and the calculated points with the relatively highest stresses are given for normal operation, maximum design earthquake, and prescribed stress combinations for break analysis. The main circulation piping attachment sockets only include stress combinations for normal operation and normal operation + maximum design earthquake. (author)
Availability note (English)
Available from Nuclear Research Institute Rez, 250 68 Rez, Czech RepublicAdditional details
Additional titles
- Original title (Czech)
- Zavery z analys integrity potrubi studeneho vstriku do KO a potrubi VT SAOZ smycek c. 2, 3 a 5 EMO, blok c. 1
Publishing Information
- Imprint Pagination
- 22 p.
- Report number
- UJV--10809-T
INIS
- Country of Publication
- Czech Republic
- Country of Input or Organization
- Czech Republic
- INIS RN
- 30020680
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Non-conventional Literature
- Descriptors DEI
- EARTHQUAKES; ECCS; MOCHOVCE-1 REACTOR; PIPES; PRESSURIZERS; PRIMARY COOLANT CIRCUITS; REACTOR SAFETY; RUPTURES; SAFETY ANALYSIS; STRESSES
- Descriptors DEC
- COOLING SYSTEMS; ENGINEERED SAFETY SYSTEMS; ENRICHED URANIUM REACTORS; FAILURES; POWER REACTORS; PWR TYPE REACTORS; REACTOR COMPONENTS; REACTOR COOLING SYSTEMS; REACTOR PROTECTION SYSTEMS; REACTORS; SAFETY; SEISMIC EVENTS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS; WWER TYPE REACTORS
Optional Information
- Notes
- 5 figs., 18 refs.