Published May 1, 2012 | Version v1
Report

Status and Plans for a Superconducting RF Accelerator Test Facility at Fermilab

Description

The Advanced Superconducting Test Accelerator (ASTA) is being constructed at Fermilab. The existing New Muon Lab (NML) building is being converted for this facility. The accelerator will consist of an electron gun, injector, beam acceleration section consisting of 3 TTF-type or ILC-type cryomodules, multiple downstream beam lines for testing diagnostics and conducting various beam tests, and a high power beam dump. When completed, it is envisioned that this facility will initially be capable of generating a 750 MeV electron beam with ILC beam intensity. An expansion of this facility was recently completed that will provide the capability to upgrade the accelerator to a total beam energy of 1.5 GeV. Two new buildings were also constructed adjacent to the ASTA facility to house a new cryogenic plant and multiple superconducting RF (SRF) cryomodule test stands. In addition to testing accelerator components, this facility will be used to test RF power systems, instrumentation, and control systems for future SRF accelerators such as the ILC and Project-X. This paper describes the current status and overall plans for this facility.

Availability note (English)

Available from Fermi National Accelerator Laboratory (FNAL), Batavia, IL

Additional details

Publishing Information

Imprint Pagination
3 p.
Report number
FERMILAB-CONF--12-177-AD

Conference

Title
3. International Particle Accelerator Conference
Acronym
IPAC 2012
Dates
20-25 May 2012
Place
New Orleans, LA (United States)

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
43127152
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
ACCELERATION; ACCELERATORS; BEAM DUMPS; CONTROL SYSTEMS; CRYOGENICS; ELECTRON BEAMS; ELECTRON GUNS; FERMILAB; MUONS; POWER SYSTEMS; TESTING
Descriptors DEC
BEAMS; ELEMENTARY PARTICLES; ENERGY SYSTEMS; FERMIONS; LEPTON BEAMS; LEPTONS; NATIONAL ORGANIZATIONS; PARTICLE BEAMS; US DOE; US ORGANIZATIONS

Optional Information

Contract/Grant/Project number
AC02-07CH11359
Notes
Conf.Proc.C1205201:58-60,2012
Funding organization
DOE Office of Science (United States)