Published June 1981 | Version v1
Journal article

Initial operation of a 100% duty factor 3-MeV Alvarez linac

  • 1. Chalk River Nuclear Labs., Ontario

Description

A 3 MeV Alvarez linac is being operated at the Chalk River Laboratories as part of a development program for high current proton accelerators that could be used for electronuclear breeding of fissile fuel. The present 1.605 m long cell structure is being operated at 100% duty factor to investigate the rf and beam diagnostic problems associated with high duty factor and high average current. The high rf power resulted in several problems, particularly the drift tube stem-to-tank joint region. Renewed experiments showed stem currents to be the major cause of bellows overheating. A two beta-lambda tank is being built to test new linac design concepts at 100% duty factor

Additional details

Publishing Information

Journal Title
IEEE Trans. Nucl. Sci.
Journal Volume
NS-28
Journal Issue
3
Series
IEEE Trans. Nucl. Sci.
Journal Page Range
3495-3497
ISSN
0018-9499