Published February 2010 | Version v1
Book

Design of startup neutron detector handling mechanism instrumentation

  • 1. Power Plant Control Division, Indira Gandhi Centre for Atomic Research, Kalpakkam (India)

Description

In PFBR, to monitor the reactor during first fuel loading and low power operation, special provision is made in the central fuel subassembly to accommodate the neutron detectors. During fuel handling operations, these detectors need to be lifted up to facilitate plug rotation. These detectors are also need to be lifted from the core to save their life, during intermediate and high power operations. Towards this, a mobile assembly containing these detectors is made with lowering and retracting provision. To control this operation, constant speed motor, torque limiter, proximity switch, wire drawn potentiometer, magnetic reed switches are provided. To ensure a smooth and safe handling of this assembly, control logic with necessary interlocks is developed. (author)

Part of:
Proceedings of DAE-BRNS national symposium on nuclear instrumentation - 2010

Additional details

Publishing Information

Publisher
Dept. of Atomic Energy
Imprint Place
Mumbai (India)
ISBN
81-88513-33-4
Imprint Title
Proceedings of DAE-BRNS national symposium on nuclear instrumentation - 2010
Imprint Pagination
679 p.
Journal Page Range
p. 219-222

Conference

Title
national symposium on nuclear instrumentation
Acronym
NSNI 2010
Dates
24-26 Feb 2010
Place
Mumbai (India)

Optional Information

Notes
3 figs.