Examination of failed studs from No. 2 steam generator at the Maine Yankee Nuclear Power Station

Description

Three studs removed from service on the primary manway cover from steam generator No. 2 of the Maine Yankee station were sent to Brookhaven National Laboratory (BNL) for examination. The examination consisted of visual/dye penetrant examination, optical metallography and Scanning Electron Microscopy/Energy Dispersive Spectroscopy (SEM/EDS) evaluation. One bolt was through cracked and its fracture face was generally transgranular in nature with numerous secondary intergranular cracks. The report concludes that the environmenally assisted cracking of the stud was due to the interaction of the various lubricants used with steam leaks associated with this manway cover

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS, PC A03/MF A01; 1 - GPO $3.75 as DE83008254.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
32 p.
Report number
NUREG/CR--2993

Optional Information

Secondary number(s)
BNL-NUREG--51594.