Decommissioning works are going on at Fontenay-aux-roses CEA center

Creators

Description

The CEA center of Fontenay-aux-roses is pursuing the dismantling operations of its nuclear installations. In 2003 120 glove boxes of the plutonium chemistry laboratory were disassembled and moved to the Cadarache CEA center. Hot cells from the Castor, Cyrano and Petrus lines are currently undergoing decontamination operations before being dismantled. As for the processing station of liquid effluents, the cutting works of the incinerator of low-level radioactive wastes and of the tanks began in 2003 and are expected to be over by end 2004. The Triton research reactor was decommissioned in 1982 and dismantling works on its hot cell and on its pool began at the end of 2003. (A.C.)

Additional details

Additional titles

Original title (French)
Poursuite des travaux d'assainissement du Centre CEA de Fontenay-aux-Roses

Publishing Information

Journal Title
Revue Generale Nucleaire
Journal Issue
no.6
Journal Page Range
p. 76-77
ISSN
0335-5004
CODEN
RGNUDJ