Published April 1984 | Version v1
Journal article

Nuclear fuel spending determination for reactor operation on-line control and planning at the WWER-440 power units

Description

For power unit operation control it is very important that their technical-economical performance should be determined at every moment. A simplified calculation method of 235U, 238U and 239Pu requirements in WWER-440 reactors using the BIPR programs is suggested. The calculation error is 4.53% at confidence level of 95%. The method can be used for the on-line control and operation planning of power units with WWER-440 reactors

Additional details

Additional titles

Original title (Russian)
Определение расхода ядерного топлива для блоков с реакторами ВВЭР-440 для целей оперативного контроля и планирования эксплуатации

Publishing Information

Journal Title
Ehlektr. Stn.
Journal Issue
no.4
Series
Ehlektr. Stn.
ISSN
0013-5372

Optional Information

Notes
For English translation see the journal Soviet Power Engineering (English Translation).