Phase lock of rapid cycling synchrotron and neutron choppers
Description
The 500 Mev synchrotron of Argonne's Intense Pulsed Neutron Source operates at 30 Hz. Its beam spill must be locked to neutron choppers with a precision of /plus or minus/0.5 /mu/s. A chopper and an accelerator have large and different inertias. This makes synchronization by phase lock to the 60 Hz power line extremely difficult. The authors have solved the phasing problem by running both the Ring Magnet Power Supply (RMPS) of the synchrotron and the chopper motors from a common oscillator that is stable to 1 ppm and by controlling five quantities of the RMPS. The quantities controlled by feedback loops are dc current, injection current, ejection current, resonant frequency, and the phase shift between the synchrotron peak field and the chopper window. 4 refs
Additional details
Publishing Information
- Journal Title
- IEEE Trans. Nucl. Sci.
- Journal Volume
- NS-28
- Journal Issue
- 3
- Series
- IEEE Trans. Nucl. Sci.
- Journal Page Range
- 2171-2173
- ISSN
- 0018-9499
Conference
- Title
- Particle accelerator conference.
- Dates
- 11 - 13 Mar 1981.
- Place
- Washington, DC (USA).
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 14724788
- Subject category
- S43: PARTICLE ACCELERATORS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- NEUTRON CHOPPERS; PHASE SHIFT; PHASE STABILITY; SYNCHROTRONS
- Descriptors DEC
- ACCELERATORS; BEAM PULSERS; CYCLIC ACCELERATORS; STABILITY
Optional Information
- Secondary number(s)
- CONF-810314--.