Published 1988 | Version v1
Journal article

BWR - in-core fuel management (ICFM)

Creators

  • 1. Teollisuuden Voima Oy (Finland)

Description

The Industrial Power Company Ltd (TVO) takes care of the fuel cycle design using the assistance from the Technical Research Centre of Finland (VTT). Design process starts 2.5 years before the loading of fuel by fixing the enrichment distribution of the reload fuel pins. Possible changes in fuel design must be planned in advance as TVO has done in changing from the standard 8x8 fuel to 9x9 and water-cross type fuels. In the fuel cycle duration design the fuel costs are balanced against the loss of production in the end of cycle which typically leads to a 3-week coastdown period and a decline of power to 90% of the nominal before shutdown for refuelling

Additional details

Additional titles

Original title (Finnish)
BWR - polttoaineen kaeyttoesuunnittelu

Publishing Information

Journal Title
ATS Ydintek.
Journal Volume
17
Journal Issue
1
Series
ATS Ydintek.
Journal Page Range
6-7
ISSN
0356-0473
CODEN
ATSYE