Status Report on Cyclotron Operation
- 1. Hungarian Academy of Sciences, Debrecen (Hungary). Inst. of Nuclear Research
Description
Complete text of publication follows. The operation of the cyclotron in 2004 was concentrated to the usual 9 months; January, July and August were reserved for maintenance and holidays. The overall working time of the accelerator was 3554 hours, the time used for systematic maintenance was 450 hours. The breakdown periods amounted to 70 hours last year, included in it a 50 hours repair of RF control module under guarantee. The cyclotron was available for users during 3034 hours. The effectively used beam-on-target time statistics is summarized in Table 1. Developments: A new measuring site with a HPGe detector based gamma spectrometer is under installation in the basement of the Cyclotron Laboratory. A two channel pneumatic rabbit system is also under development to enable fast transport of samples between the new measuring site and two irradiation sites (the low intensity fast neutron irradiation site and the beam line used for Thin Layer Activation). (author)
Additional details
Publishing Information
- Journal Title
- ATOMKI Annual Report
- Journal Issue
- no.19
- Journal Page Range
- p. 71
- ISSN
- 0231-3596
- CODEN
- AREAE9
INIS
- Country of Publication
- Hungary
- Country of Input or Organization
- Hungary
- INIS RN
- 36114720
- Subject category
- S43: PARTICLE ACCELERATORS;
- Descriptors DEI
- ATOMKI; DEBRECEN CYCLOTRON; GAMMA SPECTROMETERS; MAINTENANCE; OPERATION; RABBIT TUBES; REPORTING REQUIREMENTS; STATISTICS; USES
- Descriptors DEC
- ACCELERATORS; CYCLIC ACCELERATORS; CYCLOTRONS; HUNGARIAN ORGANIZATIONS; ISOCHRONOUS CYCLOTRONS; MATHEMATICS; MEASURING INSTRUMENTS; NATIONAL ORGANIZATIONS; REACTION PRODUCT TRANSPORT SYSTEMS; REACTOR COMPONENTS; REACTOR EXPERIMENTAL FACILITIES; SPECTROMETERS