Published 2004 | Version v1
Journal article

Status Report on Cyclotron Operation

  • 1. Hungarian Academy of Sciences, Debrecen (Hungary). Inst. of Nuclear Research

Description

Complete text of publication follows. The operation of the cyclotron in 2004 was concentrated to the usual 9 months; January, July and August were reserved for maintenance and holidays. The overall working time of the accelerator was 3554 hours, the time used for systematic maintenance was 450 hours. The breakdown periods amounted to 70 hours last year, included in it a 50 hours repair of RF control module under guarantee. The cyclotron was available for users during 3034 hours. The effectively used beam-on-target time statistics is summarized in Table 1. Developments: A new measuring site with a HPGe detector based gamma spectrometer is under installation in the basement of the Cyclotron Laboratory. A two channel pneumatic rabbit system is also under development to enable fast transport of samples between the new measuring site and two irradiation sites (the low intensity fast neutron irradiation site and the beam line used for Thin Layer Activation). (author)

Additional details

Publishing Information

Journal Title
ATOMKI Annual Report
Journal Issue
no.19
Journal Page Range
p. 71
ISSN
0231-3596
CODEN
AREAE9