Published December 2011
| Version v1
Journal article
Erection and management for polar crane of Ling'ao NPP Phase II
Creators
- 1. China Guangdong Nuclear Power Engineering Co., Ltd., Shenzhen (China)
Description
The thesis gives a perspective of NI polar crane situations of Ling'ao NPP Phase 2 from angles such as supply, erection management and technical requirements, erection difficulties encountered in practice and related document provision and filing. It details, by in-depth analysis, the management characteristics and practical difficulties of Ling'ao NPP Phase 2 and approaches certain resolutions and technical improvement such as the intervention of manufacturing of equipment, the way of drilling on the bracket etc. (authors)
Additional details
Publishing Information
- Journal Title
- China Nuclear Power
- Journal Volume
- 4
- Journal Issue
- 4
- Journal Page Range
- p. 325-337
- ISSN
- 1674-1617
INIS
- Country of Publication
- China
- Country of Input or Organization
- China
- INIS RN
- 45059115
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Descriptors DEI
- CRANES; INSTALLATION; LINGAO-2 REACTOR; MANAGEMENT; MANUFACTURING; NUCLEAR POWER PLANTS
- Descriptors DEC
- ENRICHED URANIUM REACTORS; EQUIPMENT; MATERIALS HANDLING EQUIPMENT; NUCLEAR FACILITIES; POWER PLANTS; POWER REACTORS; PWR TYPE REACTORS; REACTORS; REMOTE HANDLING EQUIPMENT; THERMAL POWER PLANTS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS
Optional Information
- Notes
- 7 figs., 2 tabs., 2 refs.