Published February 1986
| Version v1
Report
Operational phase of inspection prioritization
Description
Inspectors must make many decisions on the allocation of their efforts. To date, these decisions have been made based upon their own judgment and guidance from inspection procedures. Our goal is to provide probabilistic risk assessment (PRA) information as an additional aid to inspectors. A structured approach for relating PRA information to specific inspection decisions has been developed. The use of PRA information as an aid in optimal decision making: (1) in response to the current plant status and (2) in the scheduling of effort over an extended period of time is considered
Additional details
Publishing Information
- Imprint Title
- Thirteenth water reactor safety research information meeting: proceedings. Volume 1
- Journal Page Range
- p. 19-34.
- Report number
- NUREG/CP--0072-Vol.1
Conference
- Title
- 13. water reactor safety research information meeting.
- Dates
- 22-25 Oct 1985.
- Place
- Gaithersburg, MD (USA).
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 18002482
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS; S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- BWR TYPE REACTORS; FAILURES; IMPLEMENTATION; INFORMATION SYSTEMS; INSPECTION; MANAGEMENT; OPTIMIZATION; PROBABILITY; PWR TYPE REACTORS; REACTOR COMPONENTS; REACTOR SAFETY; RISK ASSESSMENT; SAFETY ENGINEERING; SCHEDULES; US NRC
- Descriptors DEC
- ENRICHED URANIUM REACTORS; NATIONAL ORGANIZATIONS; POWER REACTORS; REACTORS; SAFETY; THERMAL REACTORS; US ORGANIZATIONS; WATER COOLED REACTORS; WATER MODERATED REACTORS