Published May 1991 | Version v1
Report Restricted

Overview of the Superconducting Super Collider rf systems

Description

The SSC will have a linear accelerator (Linac) and five synchrotron systems (three booster synchrotrons plus two main synchrotron rings which constitute the collider). The Linac consists of three major accelerating systems an rf Quadrupole (RFQ), a Drift Tube Linac (DTL) and a Side Coupled Cavity Linac (CCL), plus buncher and compressor systems. The various Linac structures will be driven by solid-state, tetrode, and klystron amplifiers at power levels that range from less than a 1 kW to 15 MW peak power. The three booster synchrotron rf systems will utilize a multiplicity of high power vhf 160 KW tetrode amplifiers, whereas the collider rf systems will utilize four 360-MHz, 1-MW cw klystrons. The rf systems include dc power supplies, local control and monitoring systems, and accelerating cavities, as well as the rf amplifiers. The system requirements and conceptual designs for the rf systems for the Linac and the five SSC synchrotrons are presented. The status of the Linac rf systems and the Low Energy Booster Synchrotron accelerating cavity and ferrite tuner development programs are specifically addressed. 5 figs., 3 tabs

Availability note (English)

MF available from INIS under the Report Number; OSTI as DE91013828; NTIS; INIS; US Govt. Printing Office Dep.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
4 p.
Report number
SSCL--431

Conference

Title
1991 Institute of Electrical and Electronics Engineers (IEEE) particle accelerator conference (PAC).
Dates
6-9 May 1991.
Place
San Francisco, CA (USA).

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
22085295
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
BEAM BUNCHERS; LINEAR ACCELERATORS; PARTICLE BOOSTERS; RF SYSTEMS; SPECIFICATIONS; SUPERCONDUCTING SUPER COLLIDER
Descriptors DEC
ACCELERATORS; CYCLIC ACCELERATORS; STORAGE RINGS; SYNCHROTRONS

Optional Information

Contract/Grant/Project number
Contract AC02-89ER40486
Funding organization
USDOE, Washington, DC (USA).
Secondary number(s)
CONF-910505--225.