Published 1979 | Version v1
Journal article

Perceptions of risks and timing in breeder development decisions

Creators

  • 1. EPRI, Palo Alto, Calif

Description

This paper considers the role of the breeder from an electric utility point of view. FBRs will be required as a capacity option, in order to maintain flexibility in the choice of the future generation mix. The uncertainties in electric demand growth rate, and in the availability of other power technologies, indicate that foreclosing the breeder option now would not represent a prudent generation planning policy. 23 refs

Additional details

Publishing Information

Journal Title
Altern. Energy Sources
Journal Volume
6
Series
Altern. Energy Sources.
Journal Page Range
2427-2454

Conference

Title
2. Miami international conference on alternative energy sources.
Dates
10 - 13 Dec 1979.
Place
Miami Beach, FL (USA).

Optional Information

Secondary number(s)
CONF-791204--.