Published 1988 | Version v1
Journal article

Quality assurance system of building and assembly works at the Paks nuclear power plant and experiences in quality control

  • 1. Epitesuegyi Minoesegellenoerzoe Intezet, Budapest (Hungary)

Description

The principles of quality assurance system used in the construction of the first NPP in Hungary are summarized. Four hierarchic control levels are distinguished. Nuclear facilities, building and assembly technologies which are involved in the control system are listed. According to the 'super' controls carried out by special central institutes, the nuclear facilities of units 1-4 meet the demands of safety from architectural point of view. The most significant 'super' controls were the following: studies on heavy concretes, H2 containing concretes, reinforced concrete structures, the weldings of steel structures, water-proof isolation, and on quality documentation of building and assembly works. (V.N.)

Additional details

Additional titles

Original title (Hungarian)
A Paksi Atomeroemue epitoe- es szereloeipari munkainak minoesegbiztositasi rendszere es a minoesegellenoerzesek tapasztalatai

Publishing Information

Journal Title
Magyar Epitoeipar
Journal Volume
37
Journal Issue
5-6
Series
Magy. Epitoeipar.
Journal Page Range
273-276
ISSN
0025-0074
CODEN
MGYEA

Optional Information

Notes
From a collection of articles on the construction of the Paks NPP.