Published April 1988 | Version v1
Report

Pressurizer quench tank response for a loss-of-load event at the Calvert Cliffs Plant

  • 1. Baltimore Gas and Electric Company, MD (USA)

Description

In January, 1987, relief valve leakage during RCS leak rate testing caused the rupture disc on the Calvert Cliffs Unit 1 pressurizer quench tank to burst. This event led to analysis of expected tank response for anticipated transients. Changes are recommended for operating practices, and revision of the FSAR and rupture disc specification are suggested

Additional details

Publishing Information

Imprint Title
Proceedings: Fifth International RETRAN conference
Journal Page Range
p. 39.1-39.15.
Report number
EPRI-NP--5781-SR

Conference

Title
5. international RETRAN meeting.
Dates
9-11 Nov 1987.
Place
Boston, MA (USA).

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
20030274
Subject category
S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
C CODES; COMPUTERIZED SIMULATION; HEAT TRANSFER; HYDRAULICS; PWR TYPE REACTORS; R CODES; REACTOR ACCIDENTS; REACTOR SAFETY; SYSTEMS ANALYSIS; TEMPERATURE GRADIENTS; THERMODYNAMICS; TRANSIENTS; VERIFICATION
Descriptors DEC
ACCIDENTS; COMPUTER CODES; ENERGY TRANSFER; ENRICHED URANIUM REACTORS; POWER REACTORS; REACTORS; SAFETY; SIMULATION; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS