Published May 1, 2008 | Version v1
Report

New RF Control System for the 12 GeV Energy Upgrade of the CEBAF Accelerator at Jefferson Lab

Description

The CEBAF Accelerator at Jefferson Lab presently consists of 50 MeV injector, two anti-parallel superconducting linacs and two arcs for transporting beam between the linacs. By the mid-1990s, the accelerator was providing electrons up to 5.75 GeV. The 12 GeV Upgrade is a major accelerator project aimed at doubling the energy by adding 10 (five per linac) new high gradient cryomodules, each providing 100 MV of field. The new cryomodule will consist of eight 7-cell superconducting cavities operating at an average accelerating gradient of 19.5 MV/m and with an external Q=3.2 x 107. The high gradient, very high quality factor and large Lorentz detuning coefficient (KL up to 4) pose significant challenges beyond what the present analog low level RF (LLRF) control systems can handle reliably; therefore, a new digital LLRF control system has been developed. The main highlights of the new RF Control system include: a RF front-end with low temperature drift and good linearity, a large FPGA

Additional details

Publishing Information

Imprint Pagination
vp.
Report number
JLAB-ACE--08-826

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
41097273
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Non-conventional Literature
Descriptors DEI
ACCELERATORS; CAVITIES; CEBAF ACCELERATOR; CONTROL SYSTEMS; ELECTRONS; LINEAR ACCELERATORS; QUALITY FACTOR
Descriptors DEC
ACCELERATORS; DIMENSIONLESS NUMBERS; ELEMENTARY PARTICLES; FERMIONS; LEPTONS; LINEAR ACCELERATORS

Optional Information

Contract/Grant/Project number
AC05-060R23177
Notes
Invited Talk compiled for XXII IEEE-SPIE Conference
Funding organization
US Department of Energy (United States)
Secondary number(s)
DOE/OR--23177-0381