Risk effectiveness evaluation of surveillance testing
- 1. Brookhaven National Lab., Upton, NY (USA)
- 2. Universidad Politecnica de Valencia (Spain)
- 3. Science Applications International Corp., San Diego, CA (USA)
Description
To address the concerns about nuclear power plant surveillance tests, i.e., their adverse safety impact due to negative effects and too burdensome requirements, it is necessary to evaluate the safety significance or risk effectiveness of such tests explicitly considering both negative and positive effects. This paper defines the negative effects of surveillance testing from a risk perspective, and then presents a methodology to quantify the negative risk impact, i.e., the risk penalty or risk increase caused by the test. The method focuses on two important kinds of negative effects, namely, test-caused transients and test-caused equipment degradations. The concepts and quantitative methods for the risk evaluation can be used in the decision-making process to establish the safety significance of the tests and to screen the plant-specific surveillance test requirements. 6 refs., 2 figs., 2 tabs
Availability note (English)
MF available from INIS under the Report Number; OSTI as DE91010374; NTIS; INIS; US Govt. Printing Office Dep.Files
22086271.pdf
Files
(178.5 kB)
| Name | Size | Download all |
|---|---|---|
|
md5:8b91af484c47088454a824f2d8a4466b
|
178.5 kB | Preview Download |
Additional details
Publishing Information
- Imprint Pagination
- 6 p.
- Report number
- BNL-NUREG--45919
Conference
- Title
- International topical meeting on safety of thermal reactors.
- Dates
- 21-25 Jul 1991.
- Place
- Portland, OR (USA).
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 22086271
- Subject category
- S29: ENERGY PLANNING, POLICY AND ECONOMY;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- AGING; FAILURES; MANAGEMENT; MONITORING; NUCLEAR POWER PLANTS; PERFORMANCE TESTING; REACTOR MAINTENANCE; REACTOR SAFETY; RISK ASSESSMENT; SENSITIVITY; TRANSIENTS
- Descriptors DEC
- MAINTENANCE; NUCLEAR FACILITIES; POWER PLANTS; SAFETY; TESTING; THERMAL POWER PLANTS
Optional Information
- Contract/Grant/Project number
- Contract AC02-76CH00016
- Funding organization
- Nuclear Regulatory Commission, Washington, DC (USA).
- Secondary number(s)
- CONF-910714--6.