LOBI test BT-15/BT-16 pre-test calculation
- 1. Nuclear Electric plc., Bedminster Down (United Kingdom)
Description
LOBI is a higher pressure, electrically heated integral system facility simulating a KWU 1300 MW PWR scaled 1:712 by volume, although full scale has been maintained in the vertical direction. In order to complete the test programme before the facility is closed in 1991 a number of tests have been performed in tandem, where the test procedures were compatible. BT-15/BT-16 is one such composite test. In their original form both tests BT-15 and BT-16 simulated a loss of main feedwater transient with delayed auxiliary feedwater injection, with the pumps running in BT-15 and tripped in BT-16. The aim of each test was to investigate the loss of primary/secondary heat transfer as the steam generator secondary sides boiled down, and the subsequent recovery of heat transfer as the auxiliary feedwater was tripped on. Due to a re-scheduling of the test programme there was insufficient time to perform sensitivity studies and so only one, base case, calculation is presented. (author)
Availability note (English)
MF available from INIS under the Report Number.
Files
Additional details
Publishing Information
- Imprint Pagination
- 78 p.
- Report number
- AEA-TRS--1057
INIS
- Country of Publication
- United Kingdom
- Country of Input or Organization
- United Kingdom
- INIS RN
- 23022818
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Descriptors DEI
- COOLANT LOOPS; FORCED CONVECTION; LOSS OF COOLANT; NATURAL CONVECTION; PWR TYPE REACTORS; R CODES; STRUCTURAL MODELS
- Descriptors DEC
- ACCIDENTS; COMPUTER CODES; CONVECTION; ENERGY TRANSFER; ENRICHED URANIUM REACTORS; HEAT TRANSFER; POWER REACTORS; REACTOR ACCIDENTS; REACTORS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS
Optional Information
- Funding organization
- Nuclear Electric plc., Bedminster Down (United Kingdom).