Published December 1994 | Version v1
Report Open

Tau physics at future facilities

Description

This paper dicusses and projects the tau research which may be carried out at CESR, at BEPC, at the SLC, in the next few years at LEP I, at the asymmetric B-factories under construction in Japan and the United States and, if built, a tau-charm factory. As the size of tau data sets increases, there is an increasing need to reduce the effects of systematic errors on the precision and search range of experiments. In most areas of tau physics there is a large amount of progress to be made, but in a few areas it will be difficult to substantially improve the precision of present measurements

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as DE95006071; NTIS; US Govt. Printing Office Dep.

Files

26043097.pdf

Files (532.4 kB)

Name Size Download all
md5:75ebc84e9bac3653f078814fdc525b65
532.4 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
14 p.
Report number
SLAC-PUB--6730

Conference

Title
3. workshop on tau lepton physics.
Dates
19-22 Sep 1994.
Place
Montreux (Switzerland).

Optional Information

Contract/Grant/Project number
Contract AC03-76SF00515
Funding organization
USDOE, Washington, DC (United States).
Secondary number(s)
CONF-9409277--1.