Published 1990 | Version v1
Book

Review of the status of geothermal development and operation in Indonesia 1985 to 1990

Creators

  • 1. Indonesia State Electricity Corp., Indonesian Geothermal Association (Indonesia)

Description

This paper reports that the electric power sector in Indonesia will be expanded by an additional generating capacity of about 1,225 MW at the end of the fifth 5-year development plan (1989/1990 to 1993/1994) from the existing 8,529 MW. At present a 140 MW geothermal condensing plant (one unit of 230 MW and 2 units of 55 MW, all in Kamojang) and two noncondensing nonobloks (2 MW in Dieng and 25 kW in Kamojang) have been operating successfully since 1979. Based on the fifth 5-year development plan the government of Indonesia has decided to install an additional 235 MW on the island of Java and 15 MW on North Sulawesi, for a total installed capacity of 377.25 MW

Additional details

Publishing Information

Publisher
Geothermal Resources Council.
Imprint Place
Davis, CA (United States)
ISBN
0-034412-66-9
Imprint Title
1990 International Symposium on geothermal energy
Imprint Pagination
1710 p.
Journal Page Range
p. 127-145.

Conference

Title
Annual meeting of the Geothermal Resources Council and international symposium on geothermal energy.
Dates
20-24 Aug 1990.
Place
Kailua Kona, HI (United States).

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
23068444
Subject category
S15: GEOTHERMAL ENERGY;
Resource subtype / Literary indicator
Conference
Descriptors DEI
ELECTRIC POWER; GEOTHERMAL ENERGY; GEOTHERMAL POWER PLANTS; INDONESIA; POWER GENERATION; REVIEWS
Descriptors DEC
ASIA; DEVELOPING COUNTRIES; DOCUMENT TYPES; ENERGY; ENERGY SOURCES; ISLANDS; POWER; POWER PLANTS; RENEWABLE ENERGY SOURCES; THERMAL POWER PLANTS

Optional Information

Secondary number(s)
CONF-900823--.