Published February 2005 | Version v1
Report

Periodic safety review of the experimental fast reactor JOYO. Review of the activity for safety

Description

Periodic safety review (Review of the activity for safety) which consisted of 'Comprehensive evaluation of operation experience' and Incorporation of the latest technical knowledge' was carried out up to January 2005. 1. Comprehensive evaluation of operation experience. It was confirmed that the effectual activities for safety through the operation of JOYO were carried out in terms of (1) Operation management, (2) Maintenance management, (3) Fuel management, (4) Radiation management, (5) Radioactive waste management, (6) Emergency planning and (7) Feedback of incidents and failures. 2. Reflection of the latest technical knowledge. It was confirmed that the latest technical knowledge including regulation and guide line established by Nuclear Safety Commission of Japan until March 31st. 2003 were properly reflected in impressing the safety of the reactor. As a result, it was evaluated that the activity for safety was carried out effectually, and no additional measure was identified continual safe operation of the reactor. (author)

Availability note (English)

Available from JST Library (JST: Japan Science and Technology Agency), P.O. Box 10 Hikarigaoka, Tokyo 179-9810 Japan, FAX: +81-3-3979-4781 (domestic), FAX: +81-3-3979-2210 (oversea)

Additional details

Publishing Information

Imprint Pagination
5 p.
Report number
JNC-TN--9440-2005-001