Published September 1992 | Version v1
Report Open

Feedback implementation options and issues for B factory accelerators

  • 1. Stanford Linear Accelerator Center, Menlo Park, CA (United States)
  • 2. Stanford Univ., CA (United States)
  • 3. Istituto Nazionale di Fisica Nucleare, Frascati (Italy). Lab. Nazionale di Frascati
  • 4. California Univ., Berkeley, CA (United States). Lawrence Berkeley Lab.

Description

The proposed B factory accelerator facilities will require active feedback systems to control multibunch instabilities. These feedback systems must operate in machines with thousands of circulating bunches and with short (2--4 ns) interbunch intervals. The functional requirements for transverse (betatron) and longitudinal (synchrotron) feedback systems are presented. Several possible implementation options are discussed and system requirements developed. Conceptual designs are presented for the PEP II transverse and longitudinal feedback systems

Availability note (English)

MF available from INIS under the Report Number; OSTI as DE93004011; NTIS; INIS; US Govt. Printing Office Dep.

Files

24033139.pdf

Files (388.1 kB)

Name Size Download all
md5:86029e2f8bc42e8edbfe75fc9d12308b
388.1 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
8 p.
Report number
SLAC-PUB--5932

Conference

Title
state of the art in accelerators, detectors, and physics.
Acronym
B factories
Dates
6-10 Apr 1992.
Place
Stanford, CA (United States).

Optional Information

Contract/Grant/Project number
Contract AC03-76SF00515
Funding organization
USDOE, Washington, DC (United States).
Secondary number(s)
LBL--33092; CONF-9204126--15.