Published February 2003 | Version v1
Journal article

18-months fuel cycles stretch-out operation verification of protection against primary overpressure

Creators

  • 1. Nuclear Power Inst. of China, Chengdu (China)

Description

A whole range of primary temperature and pressurizer level is studied during stretch-out operation. The CATIA2 code is used to analyze a loss of main steam flow accident. The results demonstrate that primary overpressure does not cause any limitation to stretch-out operation. The pressurizer level program and average temperature are suitable for operation diagram. The bounding stretch out operation diagram is given in the present document. Two representative cases are chosen to explain these analyses

Additional details

Publishing Information

Journal Title
Nuclear Power Engineering
Journal Volume
24
Journal Issue
1
Journal Page Range
p. 73-76
ISSN
0258-0926