Considerations concerning dimensioning of steam blowing and exhausting pipes

  • 1. Power Studies and Design Institute, Bd. Lacul Tei Nr.1, R-72301 Bucharest (Romania)

Description

In order to eliminate the solid impurities from the steam pipes between the steam generator and turbine, in classical and nuclear power plants steam blowing and exhaust gas circuits are used. Some general considerations regarding the dimensioning of these circuits as well as a special proposal based on theoretical elements concerning the steam flowing through the pipes are presented. The results of a calculation example in the case of Cernavoda NPP obtained on these considerations are also given. (authors). 5 figs., 1 tab., 4 refs

Additional details

Additional titles

Original title (Romanian)
Consideratii privind dimensionarea conductelor de suflare si esapare a aburului

Publishing Information

Journal Title
Energetica. Seria A
Journal Volume
40
Journal Issue
3-A
Journal Page Range
p. 131-133.
ISSN
1220-5133
CODEN
ESEAEQ