Published January 1993 | Version v1
Report

NPP evaluation, backfitting and life extension - an engineering viewpoint

Creators

  • 1. Empresarios Agrupados, Madrid (Spain)

Description

During the decade of the '80s, the owners of the two oldest operating plants in Spain, namely, the Jose Cabrera plant, a Westinghouse PWR, and the Santa Maria de Garona plant, a GE BWR, undertook the following important programmes: 1) a far-reaching Systematic Evaluation Programme for the Jose Cabrera plant consisting in a systematic safety review of the plant design followed by the necessary hardware modifications to upgrade it and to make it comply with current safety criteria, and a Plant Upgrading Programme for the Garona plant focusing on specific topics affecting GE BWR Mark-I type plants of the same vintage; 2) a Remaining Life Management Programme to ensure that the units, after extensive backfitting and high capital investment, would complete their design life, leaving open the option for plant life extension. These two units are today looked upon by the Spanish nuclear industry as the pilot plants for Plant Life Extension programmes for PWRs and BWRs in Spain. The experience learned by the organization of Empresarios Agrupados in the engineering, design and implementation of these programmes is summarized. (Z.S.)

Part of:
Topform '92: the safe and reliable operation of LWR NPPs. Vol. I

Additional details

Publishing Information

Imprint Title
Topform '92: the safe and reliable operation of LWR NPPs. Vol. I
Imprint Pagination
235 p.
Journal Page Range
p. 135-146.
Report number
INIS-mf--13502

Conference

Title
ENS East-West topical meeting on the safe and reliable operation of LWR NPPs.
Acronym
ENS Topform '92
Dates
18-21 Oct 1992.
Place
Prague (Czechoslovakia).

Optional Information