Published 1975 | Version v1
Report

A1/water shock tube experiments at AWRE, foulness since January 1972

  • 1. UKAEA Weapons Group, Aldermaston. Atomic Weapons Research Establishment

Description

Work on this rig up to April 1971 was reported to the last Crest meeting in January 1972. An inspection of the shock tube had revealed damaged gauge seatings and a more robust replacement tube has now been supplied, complete with high quality vacuum ball valves in place of the simple gas cocks used previously. The driving reservoir is now a sealed integral extension of the top of the shock tube with the same internal bore. This enables a direct measure of the mechanical work transferred to the water column to be made by measuring the peak pressure in the recompressed reservoir gas. The improved containment has increased the measured transient peak water pressure in the thermal interaction by 25% as compared with directly comparable figures reported in January 1972. A programme of parameter variation is now proceeding in this all metal rig, starting with the temperature of the molten aluminium. The pressurised viewing cell proposed in 1972 has been designed and will be constructed and brought into use by Spring 1974

Additional details

Publishing Information

Imprint Title
Second specialist meeting on sodium/fuel interaction in fast reactors, Ispra, 21-23 November 1973
Imprint Pagination
p. 1-21 (paper SNI 2-1 pt.1).
Report number
EUR--5309

Conference

Title
2. Specialist meeting on sodium/fuel interaction in fast reactors.
Dates
21 Nov 1973.
Place
Ispra, Italy.

INIS

Country of Publication
European Commission (EC), Brussels (Belgium)
Country of Input or Organization
European Commission (EC), Brussels (Belgium)
INIS RN
7231055
Subject category
S22: GENERAL STUDIES OF NUCLEAR REACTORS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
ALUMINIUM; FAILURES; INSPECTION; PRESSURE MEASUREMENT; SEALS; SHOCK TUBES; VACUUM SYSTEMS; WATER
Descriptors DEC
ELEMENTS; HYDROGEN COMPOUNDS; METALS; OXYGEN COMPOUNDS