The high intensity radioactive beam facility at TRIUMF
Description
Construction has begun on ISAC, a radioactive ion beam and accelerator facility which utilizes the ISOL production method. A five year budget for this new radioactive beam facility at TRIUMF was approved in June 1995. ISAC includes: a new building with 5000 m2 of floor space, a proton beam-line with adequate shielding to transport up to 100 μA at 500 MeV from the TRIUMF cyclotron to two target/ion-source stations, remote handling facilities for the targets, a high-resolution mass-separator, linear accelerators and experimental facilities. The ISAC design for the target/ion source station permits the production of nuclei far from stability over a large isotopic range with high luminosity. The accelerator system includes an RFQ and a DTL yielding final energies variable from 0.15 - 1.5 MeV/u. The buildings are now complete and the installation and commissioning of the injection beam-line, target facility and the RFQ are underway. This paper outlines the ISAC project status. (author)
Availability note (English)
Available from TRIUMF, Vancouver, British Columbia (Canada).Additional details
Publishing Information
- Imprint Pagination
- 3 p.
- Report number
- TRI-PP--98-16
Conference
- Title
- 6. European particle accelerator conference. EPAC'98
- Dates
- 22-26 Jun 1998
- Place
- Stockholm (Sweden)
INIS
- Country of Publication
- Canada
- Country of Input or Organization
- Canada
- INIS RN
- 37013135
- Subject category
- S43: PARTICLE ACCELERATORS;
- Resource subtype / Literary indicator
- Conference, Non-conventional Literature
- Descriptors DEI
- HILACS; ION SOURCES; MASS SPECTROMETERS; RADIOACTIVE ION BEAMS; TRIUMF CYCLOTRON
- Descriptors DEC
- ACCELERATORS; BEAMS; CYCLIC ACCELERATORS; CYCLOTRONS; HEAVY ION ACCELERATORS; ION BEAMS; ISOCHRONOUS CYCLOTRONS; LINEAR ACCELERATORS; MEASURING INSTRUMENTS; SPECTROMETERS
Optional Information
- Notes
- 4 refs., 5 figs.