Published 1992 | Version v1
Miscellaneous

Increasing of WWER-440 fuel cycle length up to 18 months

  • 1. Gosudarstvennyj Komitet po Ispol'zovaniyu Atomnoj Ehnergii SSSR, Moscow (Russian Federation). Inst. Atomnoj Ehnergii

Description

Conversion of the WWER-440 reactor in 18 months fuel cycle with the aim of power utilization factor increase is proposed. Main characteristics of the design refueling models, fuel campaign with 20% fuel element refueling in a year, 4 years fuel cycle and two versions of fuel cycles with enlarged power production between refuelings and different number of control rods are compared. The choice of optimal fueling with increased power capacity is carried out. Techniques are proposed for modifications of reactor and power equipment maintenance schedule which ensure 18 months cycle operation. 2 refs.; 2 figs.; 5 tabs

Part of:
Problems of nuclear science and technology

Additional details

Additional titles

Original title (Russian)
Увеличение продолжительности кампании реактора ВВЭР-440 до 18 месяцев

Publishing Information

Publisher
RNTs 'Kurchatovskij Inst.'.
Imprint Place
Moscow (Russian Federation)
Imprint Title
Problems of nuclear science and technology
Imprint Pagination
96 p.
Journal Issue
no.1
Series
Fizika yadernykh reaktorov.;Fizika i metody rascheta yadernykh reaktorov.
Journal Page Range
p. 79-83.
ISSN
0205-4671
Report number
INIS-RU--372

Optional Information

Notes
Imprint:Voprosy atomnoj nauki i tekhniki.;Nauchno-tekhnicheskij sbornik.