Published July 21, 2001 | Version v1
Journal article

First operation of 11 m long undulator at NewSUBARU

Description

The synchrotron radiation source NewSUBARU has a long undulator with the total length of 10.8 m and with 200 periods for high-brilliance radiation. Commissioning studies has been performed since February 2000 and recently the first photon spectrum from the undulator was observed. The non-linearity of the magnetic field decreased both the lifetime and injection efficiency with small gap. The observed spectrum was broader than expected because of imperfect trajectory through LU, near-field effect of radiation in addition to beam emittance

Additional details

Identifiers

PII
S0168900201002327;

Publishing Information

Journal Title
Nuclear Instruments and Methods in Physics Research. Section A, Accelerators, Spectrometers, Detectors and Associated Equipment
Journal Volume
467-468
Journal Issue
1-2
Journal Page Range
p. 141-144
ISSN
0168-9002
CODEN
NIMAER

Optional Information

Copyright
Copyright (c) 2001 Elsevier Science B.V., Amsterdam, The Netherlands, All rights reserved.