Published 1980 | Version v1
Journal article

Foreign NPP decommissioning

Creators

Description

Different versions of NPP decommisioning, which worked out their life are considered. Dismantling work technology as well as devices for cutting and decontamination of equipment and concrete structures are described. Data on the quantity of shutdown and dismantled NPPs are given. It is noted that to perform successfully dismantling works it is necessary to: choose NPP decommisioning version; calculate radioactivity level; substantiate necessity of decontamination; develop the plan of removal of radioactive equipment; radioactive concrete and structures; contaminated systems; transport and bury solid, liquid and gaseous radioactive and chemical wastes; evaluate the accepted solutions of dismantling from the point of view of the effect on environment; determine costs. It is shown that optimal period of complete or partial dismantling after the NPP decommisioning is 15 years. NPPs dismantling expenditures can reach 10-15% of expenditures for their construction

Additional details

Additional titles

Original title (Russian)
Вывод из эксплуатации зарубежных АЭС

Publishing Information

Journal Title
Ehnerg. Stroit. Rubezhom
Journal Issue
no.6
Series
Ehnerg. Stroit. Rubezhom.