Design verification for large reprocessing plants (Proposed procedures)
Description
In the 1990s, four large commercial reprocessing plants will progressively come into operation: If an effective and efficient safeguards system is to be applied to these large and complex plants, several important factors have to be considered. One of these factors, addressed in the present report, concerns plant design verification. Design verification provides an overall assurance on plant measurement data. To this end design verification, although limited to the safeguards aspects of the plant, must be a systematic activity, which starts during the design phase, continues during the construction phase and is particularly performed during the various steps of the plant's commissioning phase. The detailed procedures for design information verification on commercial reprocessing plants must be defined within the frame of the general provisions set forth in INFCIRC/153 for any type of safeguards related activities and specifically for design verification. The present report is intended as a preliminary contribution on a purely technical level, and focusses on the problems within the Agency. For the purpose of the present study the most complex case was assumed: i.e. a safeguards system based on conventional materials accountancy, accompanied both by special input and output verification and by some form of near-real-time accountancy involving in-process inventory taking, based on authenticated operator's measurement data. C/S measures are also foreseen, where necessary to supplement the accountancy data. A complete ''design verification'' strategy comprehends: informing the Agency of any changes in the plant system which are defined as ''safeguards relevant''; ''reverifying by the Agency upon receiving notice from the Operator on any changes, on ''design information''. 13 refs
Files
19101686.pdf
Files
(736.2 kB)
| Name | Size | Download all |
|---|---|---|
|
md5:ee7f33dc08449ad5a4eaf1b0beabc8cd
|
736.2 kB | Preview Download |
Additional details
Publishing Information
- Imprint Pagination
- 49 p.
- Report number
- IAEA-STR--244
INIS
- Country of Publication
- International Atomic Energy Agency (IAEA)
- Country of Input or Organization
- International Atomic Energy Agency (IAEA)
- INIS RN
- 19101686
- Subject category
- S98: NUCLEAR DISARMAMENT, SAFEGUARDS AND PHYSICAL PROTECTION; S11: NUCLEAR FUEL CYCLE AND FUEL MATERIALS;
- Descriptors DEI
- ACCOUNTING; CONSTRUCTION; FUEL REPROCESSING PLANTS; IAEA SAFEGUARDS; LEGAL ASPECTS; NUCLEAR MATERIALS MANAGEMENT; OPERATION; PLANNING; VERIFICATION
- Descriptors DEC
- MANAGEMENT; NUCLEAR FACILITIES; SAFEGUARDS