Published May 16, 2005 | Version v1
Report

GLOBAL DECOUPLING ON THE RHIC RAMP

Description

The global betatron decoupling on the ramp is an important issue for the operation of the Relativistic Heavy Ion Collider (RHIC), especially in the RHIC polarized proton (pp) run. To avoid the major betatron and spin resonances on the ramp, the betatron tunes are constrained. And the rms value of the vertical closed orbit should be smaller than 0.5mm. Both require the global coupling on the ramp to be well corrected. Several ramp decoupling schemes were found and tested at RHIC, like N-turn map decoupling, three-ramp correction, coupling amplitude modulation, and coupling phase modulation. In this article, the principles of these methods are shortly reviewed and compared. Among them, coupling angle modulation is a robust and fast one. It has been applied to the global decoupling in the routine RHIC operation

Availability note (English)

Available from PURL: https://www.osti.gov/servlets/purl/15016111-Y0vybg/native/

Additional details

Publishing Information

Imprint Pagination
5 p.
Report number
BNL--73462-2005-CP

Conference

Title
PAC 2005
Dates
16-20 May 2005
Place
Knoxville, TN (United States)

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
36055427
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
BETATRONS; BROOKHAVEN RHIC; DECOUPLING; ELECTRON SPIN RESONANCE; FREQUENCY MODULATION; HEAVY IONS; POLARIZED BEAMS; PROTON BEAMS
Descriptors DEC
ACCELERATORS; BEAMS; CHARGED PARTICLES; CYCLIC ACCELERATORS; HEAVY ION ACCELERATORS; IONS; MAGNETIC RESONANCE; MODULATION; NUCLEON BEAMS; PARTICLE BEAMS; RESONANCE; STORAGE RINGS

Optional Information

Contract/Grant/Project number
KB--0202011; AC--02-98CH10886
Funding organization
DOE/SC (United States)