Published June 1993
| Version v1
Report
Linac upgrade plan for the KEK B-factory
Description
The upgrade plan for the KEK 2.5-GeV linac is discussed. In order to increase the linac energy from 2.5 GeV to 8 GeV, accelerator structures using a traveling-wave resonant ring and the SLED system are both being studied. The activities regarding the injector linac division and future plans are described. (author)
Additional details
Publishing Information
- Imprint Title
- Proceedings of international workshop on B-factories: accelerators and experiments (BFWS92)
- Imprint Pagination
- 435 p.
- Journal Page Range
- p. 216-220.
- Report number
- KEK-PROC--93-7
Conference
- Title
- international workshop on B-factories (accelerators and experiments).
- Acronym
- BFWS92
- Dates
- 17-20 Nov 1992.
- Place
- Tsukuba, Ibaraki (Japan).
INIS
- Country of Publication
- Japan
- Country of Input or Organization
- Japan
- INIS RN
- 25062015
- Subject category
- S43: PARTICLE ACCELERATORS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- BEAM INJECTION; ELECTRON BEAMS; GEV RANGE 01-10; KEK LINAC; MICROWAVE EQUIPMENT; PLANNING; POSITRON BEAMS; RF SYSTEMS; TRAVELLING WAVES; TRISTAN STORAGE RINGS; WAVEGUIDES
- Descriptors DEC
- ACCELERATORS; BEAMS; ELECTRONIC EQUIPMENT; ENERGY RANGE; EQUIPMENT; GEV RANGE; LEPTON BEAMS; LINEAR ACCELERATORS; PARTICLE BEAMS; STORAGE RINGS