Effective management of design change controls
Description
Change is clearly the order of the day in the highly evolutionary technology of the power industry. Most Architect/Engineers (A/Es) have paid dearly before learning to accommodate changes by providing some degree of flexibility and extra margins in the design of systems and facilities. Unfortunately, there is still insufficient recognition of the fact that efficient control of the mechanics of making changes will result in final drawings and specifications reflecting the as-built plant--a rather obvious and always present objective. The lack of adequate procedures inevitably results in a mountain of confused paperwork requiring costly and time-consuming measures to correct. The paper presents a set of administrative procedures based on coordinated change controls which can be applied uniformly throughout the evolution of the project. In particular, it focuses attention on the later phases of the project, from finish of construction through initial plant startup
Additional details
Publishing Information
- Publisher
- American Nuclear Society, Inc.
- Imprint Place
- Hinsdale, IL
- Imprint Title
- Nuclear power plant construction licensing and startup
- Journal Page Range
- p. VI.4.1-VI.4.7.
Conference
- Title
- American Nuclear Society's topical meeting.
- Dates
- 13 Sep 1976.
- Place
- Los Angeles, California, USA.
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 9358121
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- CONSTRUCTION; MANAGEMENT; NUCLEAR POWER PLANTS; PLANNING; SPECIFICATIONS
- Descriptors DEC
- NUCLEAR FACILITIES; POWER PLANTS; THERMAL POWER PLANTS
Optional Information
- Notes
- Imprint:See CONF-7609154--.