Published 2005 | Version v1
Miscellaneous Open

Westinghouse experience in Kozloduy NPP units 5 and 6 I and C modernization

Creators

  • 1. Westinghouse Energy Systems Bulgaria (Bulgaria)

Description

The paper presents the background, current implementation approach and experience on the largest ever modernization program on operating units WWER 1000 (PWR) at Kozloduy Nuclear Power Plant in Bulgaria. The Modernization Program itself includes more than 212 measures. Westinghouse is modernizing the major I and C systems at WWER 1000. The major topics of the modernization program and specific approach described in this paper are as follows: 1) Design Approach and Feature; 2) Installation Approach; 3) Test Strategy; 4) Licensing Strategy, applicable codes and standards. At the end author summarized that: 1) Specific design solutions were required and developed in order to address the specific plant features. At each stage, representatives of the Client are being involved in the process of designing and testing of the equipment and systems; 2) Phase-by-phase installation efforts were developed and extensive installation design documentation was prepared to fit in the limited outage window and to successfully complete the installation activities; 3) Well-prepared, multi-phase testing strategy was developed and is being implemented to assure the proper and adequate operation of the equipment at the factory and at the real plant

Availability note (English)

Available from INIS in electronic form

Files

37038488.pdf

Files (533.6 kB)

Name Size Download all
md5:bb1b5e563565571f90500d74496e5b3f
533.6 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
7 p.
Report number
INIS-BG--1036

Conference

Title
The Future of Nuclear Energy on the Balkans: Security of Energy Supply and Nuclear New Builds
Acronym
BULATOM International Nuclear Forum
Dates
15-18 Jun 2005
Place
Varna (Bulgaria)

Optional Information

Notes
4 figs.