Published August 15, 2016 | Version v1
Journal article

Moroccan wind farm potential feasibility. Case study

  • 1. Laboratory of Electric Systems and Telecommunications, Cadi Ayyad University, BP 549, Av AbdelkarimElkhattabi, Gueliz, Marrakesh (Morocco)
  • 2. IRD, UMI 209, UMMISCO, IRD France Nord, F-93143 Bondy (France)
  • 3. Laboratoire de Mathématiques et Dynamique de populations, Université Cadi Ayyad, BP 549, Av AbdelkarimElkhattabi, Gueliz, Marrakesh (Morocco)
  • 4. National Agency for the Development of Renewable Energy and Energy Efficiency (ADEREE), Renewable Energy Division, BP 509, Street Machaar El Haram, Issil, Marrakesh (Morocco)

Description

Highlights: • A new methodology for the technical feasibility of wind farm potentials is proposed. • The wind resources of two different sites in Morocco are compared. • Comparison between short and long term data using multivariate analysis is made. • Geographic information system implementation. • A 10 MW wind farm is designed and optimized. - Abstract: The subject of this paper is the elaboration of a methodology to study the technical feasibility of a wind farm potential. The implementation of this methodology allows a comparison between the wind resources of two different sites in Morocco. One site is located in the region of Essaouira, whereas the other one is located in the region of Safi. The comparison is based on real wind data collected from two masts at the heights of 30, 50, and 60 m. Each of the masts is installed at one of the mentioned potential sites over a fixed time period, lasting fifteen months for the first site, and eight months for the second one. The aim is the determination of the most applicable site presenting a good potential for a statistical study in order to predict long-term wind behaviors. Thus, the geographical situation study of the chosen site including topography, roughness and obstacles, is carried out. Furthermore, the wind resource using data, generated by the measuring masts, is evaluated. Finally, the areas which present great wind potential are located and the wind farm turbine locations are optimized by using the WAsP software.

Availability note (English)

Available from http://dx.doi.org/10.1016/j.enconman.2016.05.058

Additional details

Identifiers

DOI
10.1016/j.enconman.2016.05.058;
PII
S0196-8904(16)30436-8;

Publishing Information

Journal Title
Energy Conversion and Management
Journal Volume
122
Journal Page Range
p. 39-51
ISSN
0196-8904
CODEN
ECMADL

Optional Information

Copyright
Copyright (c) 2016 Elsevier Science B.V., Amsterdam, The Netherlands, All rights reserved.