Published December 2013 | Version v1
Journal article

The mapping and preparation of human resources for NPP'S operation and maintenance in Indonesia

  • 1. Pusat Pengembangan Energi Nuklir – BATAN, Jakarta (Indonesia)

Description

The preparation of the competent human resources (HRs) is one of the basic infrastructure of NPP's development. IAEA recommends that at the initial activity in preparation of human resources for NPP is doing Business Process Mapping by identifying the knowledge, skills and abilities of required human resources to carry out the operation and maintenance of NPPs. This study aims to mapping and preparing of human resources for NPP's operation and maintenance in Indonesia. The method used are mapping business processes at operation and maintenance stage of NPP, identifying positions, conducting surveys with questionnaires and calculations, and data analysis. Surveys and questionnaires to determine the level of technical competence of personnel in BATAN at operation and maintenance stage. Analysis using the Method of Gap Analysis with human resources Competency Standards Criteria based on technical competence qualifications. This study uses the assumption that the nuclear power plant will be built 2 units (twin) and start operation in 2027. The results showed that from the aspect of education, BATAN able to meet the needs of human resources at 53.64 to 73.75%. While from the aspect of training and specific work experience, participation level of BATAN's human resources is still very low of IAEA requirements. This case caused because young human resources in BATAN who have educational qualifications, experience, training and technical certifications in the field of operation and maintenance of nuclear power plants is still limited. Based on this, there should be preparation of NPP's human resources with establish NPP's human resources development program based on required qualifications. (author)

Additional details

Additional titles

Original title (Indonesian)
Pemetaan dan penyiapan SDM tahap pengoperasian dan perawatan PLTN di Indonesia

Publishing Information

Journal Title
Jurnal Pengembangan Energi Nuklir
Journal Volume
15
Journal Issue
2
Journal Page Range
p. 81-91
ISSN
1410-9816

INIS

Country of Publication
Indonesia
Country of Input or Organization
Indonesia
INIS RN
47095729
Subject category
S99: GENERAL AND MISCELLANEOUS;
Descriptors DEI
INDONESIA; MANPOWER; MAPPING; NUCLEAR POWER; NUCLEAR POWER PLANTS; REACTOR OPERATION; RESOURCES
Descriptors DEC
ASIA; DEVELOPING COUNTRIES; ISLANDS; NUCLEAR FACILITIES; OPERATION; POWER; POWER PLANTS; THERMAL POWER PLANTS

Optional Information

Notes
11refs., 5 tabs., 1 fig.