Published April 1991 | Version v1
Report Open

Report of the tunnel safety working group

Description

On 18 February 1991 the Project Manager formed a working group to address the safety guidelines and requirements for the underground facilities during the period of accelerator construction, installation, and commissioning. The following report summarizes the research and discussions conducted by the group and the recommended guidelines for safety during this phase of the project

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as DE95011165; NTIS; US Govt. Printing Office Dep.

Files

26069851.pdf

Files (377.4 kB)

Name Size Download all
md5:f1a125cbd7adfbd20d320e3824095b10
377.4 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
15 p.
Report number
SSCL-SR--1220

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
26069851
Subject category
S43: PARTICLE ACCELERATORS;
Descriptors DEI
PERFORMANCE TESTING; RECOMMENDATIONS; REGULATIONS; SAFETY; STANDARDS; SUPERCONDUCTING SUPER COLLIDER; UNDERGROUND FACILITIES
Descriptors DEC
ACCELERATORS; CYCLIC ACCELERATORS; LAWS; STORAGE RINGS; SYNCHROTRONS; TESTING

Optional Information

Contract/Grant/Project number
Contract AC35-89ER40486
Funding organization
USDOE, Washington, DC (United States).