Published April 1991
| Version v1
Report
Open
Report of the tunnel safety working group
Description
On 18 February 1991 the Project Manager formed a working group to address the safety guidelines and requirements for the underground facilities during the period of accelerator construction, installation, and commissioning. The following report summarizes the research and discussions conducted by the group and the recommended guidelines for safety during this phase of the project
Availability note (English)
MF available from INIS under the Report Number; Also available from OSTI as DE95011165; NTIS; US Govt. Printing Office Dep.Files
26069851.pdf
Files
(377.4 kB)
| Name | Size | Download all |
|---|---|---|
|
md5:f1a125cbd7adfbd20d320e3824095b10
|
377.4 kB | Preview Download |
Additional details
Publishing Information
- Imprint Pagination
- 15 p.
- Report number
- SSCL-SR--1220
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 26069851
- Subject category
- S43: PARTICLE ACCELERATORS;
- Descriptors DEI
- PERFORMANCE TESTING; RECOMMENDATIONS; REGULATIONS; SAFETY; STANDARDS; SUPERCONDUCTING SUPER COLLIDER; UNDERGROUND FACILITIES
- Descriptors DEC
- ACCELERATORS; CYCLIC ACCELERATORS; LAWS; STORAGE RINGS; SYNCHROTRONS; TESTING
Optional Information
- Contract/Grant/Project number
- Contract AC35-89ER40486
- Funding organization
- USDOE, Washington, DC (United States).